The talk-time ranking for the LA Metro Construction Committee is held
43% of members’ talk time is identified; members are compared from 60% (preliminary under 80%). Each member’s page has their clips and meetings. The minutes below count only speech we named by voice, so they are floors, not a ranking.
Latest meetings
- Nov 251
- Jan 261
- Feb 261
- Mar 261
- Apr 261
- May 261
- Jul 261
- Sep 261
8 meetings, all transcribed, Oct 24, 2025 to Oct 2, 2026.Newest: Sep 16, 2026
Sep 16 · Doran street grade separation project life of project budget took 8 minThe longest item after routine business: Doran street grade separation project life of project budget, 8 min of this 22 min meeting.Speakers: Jacquelyn Dupont-Walker, Lindsey Horvath, Rex Richardson
Longest item: 38% of the meeting13 agenda itemsWatch
Jul 15 · Project labor agreement/construction careers policy took 20 minThe longest item after routine business: Project labor agreement/construction careers policy, 20 min of this 44 min meeting.
Longest item: 46% of the meeting9 agenda itemsWatch
May 20 · Ara J. Najarian was called to speakImelda Padilla was called to speak took 5 minThe longest item after routine business: Ara J. Najarian was called to speakImelda Padilla was called to speak, 5 min of this 15 min meeting.
Longest item: 36% of the meeting9 agenda itemsWatch
Apr 15 · Office of the inspector general construction change order spot checks took 18 minThe longest item after routine business: Office of the inspector general construction change order spot checks, 18 min of this 45 min meeting.
Longest item: 40% of the meeting9 agenda itemsWatch
Listed after the newest meeting above, not transcribed yet (video listings through Oct 2): 0
Coming upNothing posted on city calendars as of Oct 29. Some boards post elsewhere. RSS feed
One public speaker a meeting; the biggest crowd, 6, came on Jan 14, 2026
Jan 14, 2026Metro staff presented item 17, programming $95 million of SB 125 funds for fiscal years '26 through '28 for design and advanced procurement on the Gold Line Extension Phase 2B2 from Pomona to Claremont.6 speakersMar 18, 2026Public commenters spoke on Item 9.3 speakersFeb 18, 2026The committee took up item 8, the Vermont Transit Corridor BRT Project, and staff presented the recommendation to award a Construction Manager General Contractor Phase 1 contract to Griffith Company.1 speakerNov 19, 2025The committee took up item 12, the Zero Emission Bus Charging Infrastructure Project for Division 18 and Division 7.1 speaker
bar = public speakers at that meeting · tick = average meeting